Taken from the roll call in the town’s own minutes. The minutes record who was not there and almost never why.
What was decided (1 motion)
1 carried, 0 recorded otherwise. Every motion below is printed as the minutes print it.
That the rules of procedure be waived to consider the matter below at the August 27, 2026 meeting of Public Works and Infrastructure Committee. WHEREAS local residents have raised ongoing concerns regarding vehicles making a left turn from eastbound St. Joseph Boulevard onto northbound Orléans Boulevard; and WHEREAS staff have reviewed the location for permissive/protected signal phasing and it did not meet the required warrants for installation in the eastbound direction; and WHEREAS staff have confirmed that network screening determined that eastbound and westbound left-turn collisions at this intersection are over-represented and therefore would benefit from the implementation of fully-protected left-turn signal phasing; and WHEREAS fully-protected left-turn signal phasing eliminates conflicts with opposing traffic movements, significantly reducing the frequency of left-turn collisions; and WHEREAS a preliminary operational review by Traffic Services staff has already determined that implementing fully-protected left-turn signal phasing at this location requires physical changes to the intersection; and WHEREAS functional planning, design and construction of physical changes required for implementation of fully protected left turns is funded by the Road Safety Action Plan when locations have been identified through the established network screening process; and WHEREAS there are a number of locations identified through network screening for fully protected lefts that are a